PJSC Severstal KTP 2x2500KVA
Customer:
Customer:
Object:
Purpose and objectives:
Goal:
Tasks:
Terms of implementation:
2021 -2022 гDescription of the project:
The project was preceded by work on the development of a project for the reconstruction of 3 kV networks, which was carried out by our integrated design department. A special feature of the work was the condition on the continuity of the power supply of the enterprise and the timing of the work, since the Iskitim city boiler house was powered from these networks, among other things.
Implemented design solution:
As part of the design, a work plan was developed in accordance with the customer's requirements. Work has been completed on the construction and supply of 2 RP, 3 TP, cable overpasses and cable runs with laying in trays. 3 kV networks have been dismantled. All equipment manufactured by IDI-ENGINEERING LLC is installed in the substations, including 6 kV Ultima cells and IDRT dry transformers. As a result, the Customer received a turnkey facility from a single contractor.